Construction Updates

Construction Update

Tuesday, January 11, 2011

The installation of insulation has begun on the outside of the Ambulatory Care Center.
Welding work in the new main entrance.
Concrete has been poured for the ground floor of the Ambulatory Care Center. On the ground floor of the Ambulatory Care Center, facing the former Ozanam entrance.
Framing work has begun on the second floor of the Ambulatory Care Center. A few walls have been installed on the third floor of the Ambulatory Care Center.

1/11/2011
Construction of the Main Entrance and Ambulatory Care Center

Construction for Phase I of the Diagnostic Imaging project.
Construction for Phase I of the Diagnostic Imaging project.
Construction for Phase I of the Diagnostic Imaging project.
Construction for Phase I of the Diagnostic Imaging project.

1/11/2010
Construction for Diagnostic Imaging


Construction Update

Thursday, December 30, 2010

Inside the ground floor of the Ambulatory Care Center.
Inside the ground floor of the Ambulatory Care Center, under the deck of the first floor, looking towards the former Ozanam entrance..
On the second floor of the Ambulatory Care Center.
On the third floor of the Ambulatory Care Center.

12/30/2010
Construction of the Main Entrance and Ambulatory Care Center

Construction of Diagnostic Imaging.
Construction of Diagnostic Imaging.
Construction of Diagnostic Imaging.
Construction of Diagnostic Imaging.

12/30/2010
Construction for Diagnostic Imaging


HVAC Unit for ACC Installed

Tuesday, December 21, 2010

On Monday, December 20, construction workers prepared for the installation of a 20,000 pound heating, ventilating, and air conditioning (HVAC) unit. A large crane was brought in to lift the four-piece unit onto the roof of the new Ambulatory Care Center.

A crane lifts the first of four HVAC units onto the roof of the Ambulatory Care Center.
Construction workers wait along side three HVAC units that will be lifted to the roof of the Ambulatory Care Center.
Construction workers connect a lift to one of four HVAC units that will be installed on the roof of the Ambulatory Care Center.
The crane begins to lift one of four HVAC units to the roof of the Ambulatory Care Center.
The crane lifts one of four HVAC units to the roof of the Ambulatory Care Center.

12/20/2010
HVAC Unit Installation


Construction Update

Friday, December 17, 2010

Inside the ground floor of the Ambulatory Care Center. On the second floor of the Ambulatory Care Center.
On the second floor of the Ambulatory Care Center. On the second floor of the Ambulatory Care Center.
On the third floor of the Ambulatory Care Center.
On the third floor of the Ambulatory Care Center.

12/17/2010
Construction of the Main Entrance and Ambulatory Care Center

Construction in Diagnostic Imaging.
Construction in Diagnostic Imaging.
Construction in Diagnostic Imaging.
Construction in Diagnostic Imaging

Construction for Diagnostic Imaging.

12/17/2010
Construction for Diagnostic Imaging


New Sign Installation

Tuesday, November 30, 2010

On Tuesday, November 30, a new sign was installed at the entrance to West Drive. The new sign is more colorful and visible, compared to the previous sign, and it also helps promote some of the services offered at the hospital.

The lettering was mounted on the sign by hand before installation. All the lettering is in place.
The signage workers assemble the remaining piece of the sign and check the electrical components. Lowering the new sign into place.
Lowering the new sign into place. Some final leveling before pouring the concrete.
Pouring the concrete for the new sign. Leveling the concrete.
The new West Drive sign.